检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京工程学院,江苏南京210013
出 处:《建筑管理现代化》2007年第6期43-46,共4页Construction Management Modernization
摘 要:工程量清单计价方法颁布后,规定了工程量清单的编制方法和计价的原则,但工程建设定额仍然是工程项目估价的重要依据。结合工程量清单项目内容,提出了用编制综合预算定额的方法编制企业定额,可以直接满足清单项目投标报价的需要,简化工程量清单计价过程;工程量清单项目的设置应该反映构成建筑物实体完整的结构构件价值,才能与工程实际相符合,和现行的概预算定额相适应。The method of pricing by BOQ was promulgated in which the budgeting method and estimation principle were ruled, but the quota was still one of the important bases to cost estimation of project. In this paper, budgeting enterprise quota by making synthetic quota was put forwarded to meet the demand of pricing by BOQ and simplify the process of pricing combined with contents of the detailed items. The intact structural element value of the building entity should be reflected in the installation of detailed items that not only conformed with the engineering but also suited for the quota at the preset time.
关 键 词:工程造价 计价方法 工程量清单计价 工程定额 适用性
分 类 号:TU723.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.45