检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆400044
出 处:《现代隧道技术》2007年第6期77-81,共5页Modern Tunnelling Technology
摘 要:随着西部大开发战略的实施,我国西部地区公路隧道工程的数量越来越多,工程等级也不断提高。然而在隧道施工中难免会遇到诸如岩溶突水、岩爆、围岩大变形、塌方等地质灾害问题,为了将地质灾害影响程度降到最低,在隧道施工前进行地质超前预报是十分必要的。文章以大坪隧道为例,介绍了TGP12(高频地震反射法)探测系统的原理、数据处理、解译技术,通过对比分析验证了预报结果的准确性,并总结了应用TGP12进行地质超前预报的体会,展示了TGP12探测系统在隧道施工地质超前预报中的广阔应用前景。With the implementation of the strategy of developing the western regions of China, there are more and more highway tunnel projects built in western regions while their grades are also raising. As geologic conditions of the projects are complex, they are unavoidable to encounter with some geologic hazards such as karst water gush- ing, rock outbursts, high deformations or collapses of surrounding rocks. To minimize geological disasters, applying advance geological prediction before tunnel excavation is necessary. This article, citing Daping tunnel as example, introduces the principles, data processing and explanation technology of TGP12 (High - frequency seismic reflection method). The accuracy of the forecasted results has been confirmed through contrast analyses, and the experience of TGP12 geology forecast has been summed up. The broad application prospect of the TGP12 tunnel geological forecast system in the tunnel construction geological prediction has been highlighted.
分 类 号:U452[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43