检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京工程学院能源与动力工程学院,江苏南京211167 [2]中南电力设计院湖北,武汉430071
出 处:《南京工程学院学报(自然科学版)》2007年第4期33-37,共5页Journal of Nanjing Institute of Technology(Natural Science Edition)
基 金:南京工程学院科研基金项目"火电厂冷却水泵进水池三维紊流数值模拟及优化水力设计"(KXJ06034)
摘 要:进水池的流态不仅与进水池结构有关,而且与进水条件有关.传统的数值模拟对泵站进水池进口边界条件垂直入流假设并不符合多机组泵站进水池的情况.整体数值模拟方法的计算区域为整体进水设施,避免了对进水池进口流态直接描述的问题,能够更加准确预测进水池内的流态.Flow patterns of intake sump bear on intake sump structure and inlet conditions. However, the numerical simulation of traditional assumption as to upright inlet boundary conditions fails to correspond with the actual case of muhi-unit pumping station. This paper introduces an integrated numerical simulation, the numerical areas of which entail the whole inlet facilities. Such simulation can avoid describing directly inlet flow of intake sumps and can accurately predict the/low patterns in the sump.
分 类 号:TV131.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40