检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学土木工程学院,江苏南京210096 [2]天津市市政工程设计研究院滨海分院,天津300457
出 处:《岩土工程学报》2008年第2期268-271,共4页Chinese Journal of Geotechnical Engineering
基 金:国家科技支撑计划资助项目(2006BAG04B01)
摘 要:在天津滨海新区地区采用自平衡测试技术对90 m超长钻孔灌注桩进行原位测试。测试发现桩身轴力分布与荷载箱位置有关,桩在总体位移较小的情况下失去承载能力。桩侧摩阻力发挥所需位移较小且有突变性,桩端阻力则基本不能得到发挥,超长桩在承载力设计时应谨慎考虑桩端阻力。The in-situ tests on extra long cast-in-place pile were conductyed by self-balanced loading tests in the area of contiguity to the sea in Tianjin. The length of the piles was above 90 m. The distribution of axial force of piles was related to the position of loading boxes in the tests. The bearing capacity of piles was lost under the condition of small total displacement. The lateral friction of piles developed with small displacement mutably. At the same time, the tip resistance could not develop. So the tip resistance should be cautiously considered when the bearing capacity of extra long piles was designed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.238