检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]福建电力调度通信中心,福建省福州市350003
出 处:《水电自动化与大坝监测》2008年第1期37-39,共3页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:分析了水电厂监控系统中现有自动发电控制(AGC)远方控制功能存在的问题,对水电厂监控系统接收和处理省调下发AGC远方单机控制命令的各个环节及所需时间进行了实际测算,分析了各环节产生时延的原因,提出了减少控制环节、提高数据传输速率等改进措施,减少了AGC控制时延,提高了AGC机组对命令的响应及控制精度。The existing problems in the AGC remote control function of the hydropower station monitoring and control system are analyzed. Each link and its delay time related to the hydropower station monitoring and control system receiving remote AGC commands from the provincial dispatch center are measured. Based on the analysis of the cause of time delay, improvements are proposed for reducing control loops and enhancing data transmission rate so that the AGC command control delay can be reduced and the precision of control can be improved.
分 类 号:TV734.4[水利工程—水利水电工程] TV736
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.75.143