检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Peng Yuanchang Jin Wen(Translated)
机构地区:[1]Journalist of China Electric Power [2]不详
出 处:《Electricity》2007年第4期44-46,共3页电气(英文版)
摘 要:The foundation laying ceremony for the project transmitting plentiful electricity from the huge hydropower stations group on Jinsha River some 2000 km away to eastThe foundation laying ceremony for the project transmitting plentiful electricity from the huge hydropower stations group on Jinsha River some 2000 km away to east coastal relatively economy-developed regions was held in Fengxian District, Shanghai on May 21. This ±800-kV demonstrative UHVDC transmission project from Sichuan to Shanghai, which will cost 18 billion Yuan and will be completed in four years, will create 18 world tops, such as the highest voltage grade, the longest transmission distance, the largest transmission capacity and etc.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248