New mining technique with big panels and stopes in deep mine  被引量:3

New mining technique with big panels and stopes in deep mine

在线阅读下载全文

作  者:王贻明 吴爱祥 陈学松 杨保华 苏永定 

机构地区:[1]School of Resource and Safety Engineering,Central South University

出  处:《中国有色金属学会会刊:英文版》2008年第1期183-189,共7页Transactions of Nonferrous Metals Society of China

基  金:Project(2004BA615204)supported by Key Technology Research and Development Program of China;Project(50574099)supported by the National Natural Science Foundation of China

摘  要:For the purpose to suit the bad mining technical conditions,such as deep imbed,gentle dip angle,and high initial stress in Dongguashan deposit,the stoping scheme was optimized.The new mining technique,with temporary curtain walls,large panels and stopes,was achieved as well.The deposit model,which was built through the DATAMINE,was led into FLAC3D for numerical simulation.Based on these,the stabilities of pillars and stopes were analyzed.On the other hand,the impact of output stability by new scheme was verified with the help of optimization planning theory.The results show that stopes and curtain walls are safe when the width of temporary curtain walls between panels are 18 m.The length and width of stope increase to 78 m(82 m)and 18 m respectively,and those of panel increase to 300-500 m and 100 m respectively.The commercial test indicates that the new scheme can attain the aims of simpler production organization,better stope ventilation and work condition,smaller quantities of development and cutting,and 2/3 of equipments as before with the stable output.The pillar stoping technique is credible and valuable.For the purpose to suit the bad mining technical conditions, such as deep imbed, gentle dip angle, and high initial stress in Dongguashan deposit, the stoping scheme was optimized. The new mining technique, with temporary curtain walls, large panels and stopes, was achieved as well. The deposit model, which was built through the DATAMINE, was led into FLAC^3D for numerical simulation. Based on these, the stabilities of pillars and stopes were analyzed. On the other hand, the impact of output stability by new scheme was verified with the help of optimization planning theory. The results show that stopes and curtain walls are safe when the width of temporary curtain walls between panels are 18 m. The length and width of stope increase to 78 m (82 m) and 18 m respectively, and those of panel increase to 300-500 m and 100 m respectively. The commercial test indicates that the new scheme can attain the aims of simpler production organization, better stope ventilation and work condition, smaller quantities of development and cutting, and 2/3 of equipments as before with the stable output. The pillar stoping technique is credible and valuable.

关 键 词:回采计划 采矿技术 深矿山 技术类型 

分 类 号:TD803[矿业工程—矿山开采]

 