检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张建华[1] 张毅刚[1] 高波涛[1] 尤德清[1]
机构地区:[1]北京工业大学空间结构研究中心,北京100022
出 处:《北京工业大学学报》2008年第1期48-52,共5页Journal of Beijing University of Technology
基 金:国家自然科学基金(50278004)
摘 要:为了解决索穹顶结构施工过程分析的难题,应用非线性时变有限元方法对索穹顶结构施工过程进行了分析,全过程跟踪分析索穹顶结构在各施工阶段的力学性状,得出施工过程杆件内力和节点位移的演变规律,得出不考虑施工过程的时变效应对结构设计偏于不安全的结论,为该类结构的设计和施工提出指导性建议.To solve the difficult problem of construction analysis for cable dome, the method of nonlinear time-varying mechanics is adopted to analyze the construction process of cable dome in this paper. The structural characteristics in every construction stage are analyzed by time-varying mechanics, and the variations of internal force and displacements are obtained, the paper reaches a conclusion that it is not safe to design if the time varying effect is not considered in the construction process analysis. At last, advices on design and construction of cable dome are made.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222