台州电厂四期机组投产后稳定措施研究  

A Study on Measures for System Stabilization after the Commissioning of Taizhou Power Plant′s Phase 4 Project

在线阅读下载全文

作  者:张宁 李海翔 黄良宝 孙春晓[2] 

机构地区:[1]浙江省电力局中调所 [2]清华大学

出  处:《华东电力》1997年第7期14-18,共5页East China Electric Power

摘  要:介绍了台州电厂四期机组投产稳定问题的研究结果,并提出相应的稳定措施。结果表明:如果能在台州四期新增加的2台330MW机组上加装非线性最优励磁控制器并配合切1台125MW机组措施。The research of system stability after the commissioning of Taizhou Power Plant′s phase 4 project (2×330 MW) are described and themeasures for the stabilization of the systeam suggested. The results showed that the addition of non linear optimal excitation controller on two 330 MW units with the cut off of one 125 MW unit in fault state, the stable operation of the system will be basically assured after the commissioning of phase 4 project under normal operation mode and maintenance mode.

关 键 词:发电机 非线性最优控制 稳定措施 发电厂 

分 类 号:TM621.3[电气工程—电力系统及自动化] TM712

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象