检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《水电站设计》2008年第1期1-4,9,共5页Design of Hydroelectric Power Station
摘 要:通过对二滩水电站气温、库水温的实测资料、水库运行情况、库底淤积情况等分析,总结分析了影响高坝坝前水温的因素,认为在分析高坝水库水温时,除了要考虑水库的形状、水文气象条件外,还应充分考虑水库运行条件、水库初始蓄水条件对水库水温的影响。In this paper, through analyses of Ertan Hydropower Station dam site ambient temperature and the reservoir water temperature measured data,reservoir operation conditions and sedimentation in the reservoir,the factors influencing the water temperature in front of the high arch dam are summarized and studied. It is deemed that during analysing water texture in a high dam reservoir, beside the reservoir configuration,hydrologic and meteorological conditions should be considered the reservior operation conditions and influence of the reservoir initial impoundment conditions on the reservoir water temperature should also be taken into full consideration.
关 键 词:高拱坝 水库 水温 温度 边界条件 影响因素 二滩水电站
分 类 号:TV642.4[水利工程—水利水电工程] TV315
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.70.102