配网设备年度更替决策方法的研究  被引量:9

Annual replacement decision-making methods for distribution network equipment

在线阅读下载全文

作  者:王佳贤[1] 王建民[2] 程浩忠[1] 李亦农[2] 王赛一[2] 

机构地区:[1]上海交通大学电子信息与电气工程学院,上海200240 [2]上海市电力公司市区供电公司,上海200080

出  处:《华东电力》2008年第2期82-85,共4页East China Electric Power

基  金:上海市重点科技攻关(041612012)计划资助

摘  要:针对传统设备更替决策方法没有充分反映配电网可靠性和经济性的特点,提出了结合供电可靠性和设备经济性的配网设备年度更替决策方法。该方法由全网设备的更替需要决策和单台设备的更替方案决策两部分组成:以保证配网可靠供电为目标,运用可能更替百分比指标确定全网需要更替的设备;考虑更替对设备性能的改善,运用设备更替益本比指标确定单台设备的更替方案。所提方法在上海市四平社区的成功运用,为其配网设备年度更替计划的制定提供了良好的借鉴参考。The traditional equipment replacement decision-making methods do not sufficiently consider the reliability and economy characteristics of the distribution network. To solve the problem, a new method based on power supply reliability and equipment economy is proposed. The method consists of two parts : equipment-replacing necessity decision-making, which is used for all equipment in the network to select the ones that should be replaced annually by using the equipment-replacing probability index, aiming at ensuring reliable power supply, and the equipment-replacing scheme decision-making, which is used for individual equipment to find out the best replacing scheme among three alternatives by using the equipment-replacing B/C ratio index, considering its performance improvement. The proposes method was successfully applied to Shanghai Siping Community.

关 键 词:配电网 电力设备 更替决策 可靠性 经济性 可能更替百分比 设备更替益本比 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象