平地堆山型简易垃圾填埋场封场边坡处理与渗沥液控制方案设计  被引量:2

Plan Design for Slope Treatment and Leachate Control in Closure of Dumping Waste Landfill Site of Flat Piled Mountain Type

在线阅读下载全文

作  者:徐晓霞[1] 张岩松 蔡苇 

机构地区:[1]大连市环境卫生管理处

出  处:《环境卫生工程》2008年第1期39-40,44,共3页Environmental Sanitation Engineering

摘  要:针对简易堆山型填埋场在封场覆盖过程中面临的渗沥液外溢、边坡过陡等问题,结合大连市毛茔子垃圾填埋场二期填埋区的封场实践,提出通过修建混凝土挡墙增加填埋容积,控制封场坡度;设置渗沥液主动导排、被动拦截、原位回灌的整体解决方案,实现简易填埋场的规范封场覆盖。Aiming to some existing problems in closure cover of dumping landfill site of piled mountain type, including leachate leakage, steep slope and so on, combining closure practice of second landfill area in Maoyingzi waste landfill site of Dalian, integral solution for realizing standard closure cover of dumping landfill site was put forward by constructing concrete walls to increase landfill capability and control closure slope, installing leachate recirculation, initiative drainage and passive intercept.

关 键 词:平地堆山型简易填埋场 封场覆盖 渗沥液 边坡处理 

分 类 号:X705[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象