拉西瓦水电站主厂房施工前后围岩类别对比分析  

Comparison analysis of surrounding rock classification before and after excavation on powerhousre of Laxiwa hydropower station

在线阅读下载全文

作  者:杨天俊[1] 王连福[1] 郑世华[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院工勘分院,兰州730050

出  处:《西北水电》2008年第1期8-10,17,共4页Northwest Hydropower

摘  要:拉西瓦水电站是黄河上游最大的水电站工程,右岸地下厂房系统具有深埋性、洞群式、大跨度、高边墙、延伸长等特点。随施工进展,地质编录、图件绘制、超前预报、计算分析等施工地质工作同步进行。简要总结主、副厂房洞室围岩的分类,并将其与前期勘探资料进行了对比,两者围岩类别划分基本一致。Laxiwa hydropower station is the largest one on the upstream of Yellow River. The underground powerhouse on the right bank is characterized with deep embedment, tunnel group, long - span, high - wall, long - extension, etc.. With construction progress, geologic log, mapping, geological forecasting, computation and analysis, a brief summary is presented for surrounding rock classification of the powerhouse and service building, and the classification results are basically in accordance with pregeological data.

关 键 词:地下厂房 围岩类别 物探检测 施工地质 

分 类 号:TV223.1[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象