葛洲坝大江电厂排沙底孔进水口门槽底坎区域冲坑成因分析及处理措施  

Genetic analyses and treatment measures of scouring pits at service gate slot of sediment bottom sluice for Gezhouba power plant

在线阅读下载全文

作  者:刘畅快[1] 张壮志[1] 

机构地区:[1]中国长江电力股份有限公司,宜昌443002

出  处:《西北水电》2008年第1期24-27,共4页Northwest Hydropower

摘  要:如何解决低水头径流式电站的防沙问题,防止发电进水口淤积,减少泥沙过机一直是水工建筑物检修的技术难点,通过对葛洲坝大江电厂排沙底孔上游检修门槽底坎区域冲坑成因的分析及处理方法的研究,希望能够对同类型水工建筑物检修提供借鉴。It's a technical and difficult problem on the maintenance of hydraulic structures about how to deal with sediment discharge, decrease sediment accumulation before dam and an amount of sand flowing through hydraulic turbine for low head run - off - river power stations. By genetic analysis and treatment of scouring pits in the area of service gate slot for sediment bottom sluice of Gezhouba First power plant, which can provide useful reference for similar projects.

关 键 词:排沙底孔 检修门槽 冲坑 分析 

分 类 号:TV673[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象