检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]二滩水电开发有限责任公司,四川成都610021 [2]西南石油大学建筑工程学院,四川成都610500
出 处:《水力发电》2008年第2期85-87,共3页Water Power
摘 要:水电工程施工导流的成败与导流标准的选择密切相关,导流标准的选择必须综合协调导流建筑物的建设投资、工期、系统风险率及其风险损失。运用多目标决策理论,建立了施工导流标准风险决策模型,通过对某水电站施工导流标准的决策分析表明了该方法和模型是可行的,并能较好地处理导流工程的施工强度、投资和风险损失的关系。For a hydropower project, river diversion planning directly decides the dam construction and has a consanguineous relation with the diversion standard. The relations between selection of diversion standard and investment, construction strength, risk and its losses of diversion structures should be coordinated. This paper establishes a risk decision analysis of river diversion standards during initial stage by means of multi-objective decision making theory. The case study of the diversion standards for a hydropower project shows that the method and model are effective, and solve the relation problem among construction strength, investment and the risk.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33