检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李明光[1]
出 处:《辽宁省交通高等专科学校学报》2008年第1期4-6,68,共4页Journal of Liaoning Provincial College of Communications
摘 要:钢管混凝土系杆拱桥是我国近年来桥梁发展史上的一种新颖结构,具有自重轻、承载大、抗变形能力强的优点,在现代桥梁中处于有利的竞争地位。本文以宁波慈城大桥为依托,对该桥施工过程进行了分析,并采取必要的施工监控手段,使整个桥梁施工过程中受力和变形都处于理想状态中。Tied concrete- filled steel tubular (CFST) arch bridge is a sort of novelty structure in our country bridge developmental history in recently years. It has the merits of light deadweight, great beating capacity and strong distortion - resistant capacity, which occupies a competitive position in the field of modern bridges. On the basis of Ningbo Cicheng Bridge whole construction course, analysis has been made on the construction course, and necessary construction supervision instrument has been adopted to make the bridge stress, therefore distortion are perfect in the whole construction course.
分 类 号:U448.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117