检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东师范大学河口海岸科学研究院河口海岸学国家重点实验室,上海200062 [2]上海市滩涂造地有限公司,上海200122
出 处:《海洋工程》2008年第1期108-113,共6页The Ocean Engineering
基 金:国家“973”基础研究计划资助项目(2002CB412403);国家自然科学基金资助项目(40576042)
摘 要:杭州湾北岸经历了先侵蚀后淤涨的历史过程。近年来由于南汇边滩大规模促淤圈围工程及长江来沙量减少,造成冲刷带由东向西移动。经分析东部南汇段2003年以来处于冲淤平衡阶段,奉贤段总体上处于冲刷状态,顶冲点移至三团港附近,金山段处于相对稳定状态。The north of Hangzhou Bay has experienced the processes from retreat to siltation. In recent years, the erosion zone has moved from the east to the west due to both the reclamation works on large scales along the Nanhui tidal flat and decreasing of sediment fluxes from the Yangtze River. The Nanhui section in the east part of Hangzhou Bay has been in balance between erosion and sihation since 2003, and the Fengxian section has experienced erosion on the whole, with the erosion zone shifting to a location near Santuangang, and the Jinshan section in the west part is now in relative steady state.
分 类 号:TV148[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158