检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长春工程学院水利与环境学院,吉林长春130012 [2]通辽市水利科学研究所,内蒙古通辽010010
出 处:《水利经济》2008年第2期30-32,共3页Journal of Economics of Water Resources
摘 要:针对渠系建筑物涵闸下游水流特点,认为渠系建筑物涵闸下游可采用一种适合于低弗氏数消能的新型消能结构——拱网消力池,并对通辽西辽河灌区先锋支渠、孟家段干渠和太平河水库泄洪洞采用拱网消能的工程实例进行了分析。结果表明,与普通消力池相比,拱网消力池的池长可缩短50%以上,池深可减少约30%,且消能率可提高20%以上,比普通消能措施节省工程造价30%以上。In consideration of the hydraulic characteristics of canal system structures,the arch net-floor stilling ponds were regarded to be suitable for many low water head hydraulic structures.Several engineering cases such as Xianfeng branch canal of Liaohe River,Mengjiaduan main canal,and Taiping River reservoir were analyzed.The results show that the length of the arch net-floor stilling ponds can be 50% of that of the ordinary stilling basins and the depth and engineering cost can decrease by more than 30% compared with those of the ordinary stilling basin.The rate of energy dissipation can increase by 20%.
分 类 号:TV51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113