检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中南电力设计院,武汉市430071
出 处:《电力建设》2008年第4期16-19,共4页Electric Power Construction
摘 要:向家坝—上海±800kV特高压直流复龙换流站接地极按三站共用接地极设计,共用接地极相比常规独立接地极有其设计特点和技术难点。在共用接地极设计系统运行条件的选取、共用接地极布置方案、导流系统设计、馈电材料选择、大电流接地极对电力系统的影响等方面,其设计研究成果可为后续工程提供借鉴。Fulong converter station of Xiangjiaba-Shanghai ±800 kV UHV DC line has a common ground electrode shared by 3 stations, which has its own design and technical challenges compared to regular independent ground electrodes. The results of design study in such aspects as operating condition selection and arrangement of common ground electrode, diversion system design, feed material selection, effect of large ground electrode current on power system, etc., can be used as references for following-up projects.
关 键 词:共用接地极 分体式 紧凑形 高硅铸铁 独立导流 电力系统影响
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117