大型屋盖整体顶升施工技术  被引量:16

Construction Technology on Integral Hoisting of Large Roof

在线阅读下载全文

作  者:吴聚龙[1] 

机构地区:[1]中建八局工业设备安装有限责任公司,江苏南京210046

出  处:《施工技术》2008年第3期40-42,共3页Construction Technology

摘  要:武汉体育中心二期主体育馆屋盖为双层扁平张弦网壳。结合该结构的施工特点,运用大型集群控制液压千斤顶进行中心区域整体顶升、空中悬停接长,四周区域采取满堂红脚手架高空散装的施工方案。并借助ANSYS有限元分析软件,根据施工顶升步骤,进行有限元建模分析,模拟施工工况,为方案的实施提供充分的理论依据。实践证明根据数值模拟分析结果进行针对性的预案措施准备是确保施工顺利实现的保障。Main Stadium roof of Wuhan Sports Center Second phase is the flat double-reticulated shell-string structure. Based on construction characteristics of the structure, central area structure was integrally hoisted by large-scale thinking controlled hydraulic jack, and then was jointed in length at high space. Correspondingly, peripheral areas were supported by over-site scaffold, and were jointed at high altitude. Based on hoisting steps, construction conditions were simulated by ANSYS software to provide theoretical basis for construction scheme. Practice shows that smooth construction can be ensured by pertinence scheme preparation according to simulating results.

关 键 词:钢结构 整体顶升 工艺流程 施工方法 

分 类 号:TU745[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象