思林水电站非溢流坝段渗流分析  

Seepage analysis of the non-overflow section at Silin hydropower station

在线阅读下载全文

作  者:张彦辉[1] 于海龙 

机构地区:[1]三峡大学土木水电学院,湖北宜昌443002 [2]中国水电基础工程局有限公司二公司,天津301700

出  处:《大坝与安全》2008年第1期41-44,共4页Dam & Safety

摘  要:思林水电站大坝是一坝高117m的碾压混凝土重力坝,其坝身及地基渗径是筑坝中的关键技术问题。本文应用平面有限元方法对坝体及坝基稳定渗流进行了计算分析,计算中碾压混凝土坝层面渗流按各向异性考虑。针对碾压混凝土坝的筑坝方式,选用三种方案进行渗流分析计算,研究碾压混凝土坝渗透特性及其影响因素。经渗流分析计算,得出碾压混凝土坝渗透特性主要取决于层面、上游防渗面板、防渗帷幕的渗透性。The roller compacted concrete gravity dam at Silin hydro power station is of 117 m high. The key technological problem is the seepage path at the dam body and foundation. Two-dimensional finite element model was applied to analyse the seepage of dam and dam foundation. In calculation, it assumed that the interlayer seepage was anisotropic. According to construction method of roller compacted concrete gravity dam, three calculation schemes were adopted to research on the characteristic of seepage and other influencing factors. By seepage analysis, conclusion was gotten that the seepage characteristic of roller compacted concrete dam were determined by the seepage characteristics of layer, upstream anti-seepage faceplate panel and seepage proof curtain.

关 键 词:有限元模型 非溢流坝段 渗流分析计算 防渗面板 层面 防渗帷幕 思林水电站 

分 类 号:TV223.4[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象