检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张一军[1]
出 处:《水力发电》2008年第3期14-16,46,共4页Water Power
摘 要:为了按照国家新发布的法律法规做好水电工程建设征地移民安置的规划设计工作,DL/T5064—1996《水电工程水库淹没处理规划设计规范》须进行修订。在规范修订过程中,新名称命名为《水电工程建设征地移民安置规划设计规范》,并增编了《水电工程建设征地处理范围界定规范》等7项水库技术标准,作为水库规范系列进行了创新调整。为此,对修编的《水电工程建设征地移民安置规划设计规范》等8个规划设计技术标准系列的指导思想和修编特点进行阐述,以科学发展观解读新的技术规范。In order to implement the planning and design of land requisition and resettlement of hydroelectric projects in accordance with laws and regulations recently issued by the government, the “Specifcation for Planning and Design of Reservoir Inundation of Hydroelectric Projects”(File No. DL/T5064-1996) has been revised. The revised standard is en- titled “Specification for Planning and Design of Reservoir Land Requisition and Resettlement of Hydroelectric Projects”. Meanwhile the formulation of seven teetmical standards, including the “Definition of Range of Land Requisition for Resetflement of Hydroelectric Projects”, relating to reservoir projects have been inclnded as an innovation to the series of reservoir standards. Guided by the outlook on scientific development and the principle of building harmonic society, the Paper desexes the features of the revision of the eight planning and design standards including the “Specification for Planning and Design of Reservoir Land Requisition and Resettlement of Hydroelectric Projects so as to facilitate the readers to better comprehend and implement the new technical specifications and carry out the planning and design of resettlement in a better way.
分 类 号:D922.395[政治法律—法学] TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15