检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电建设集团国际工程有限公司,北京100044 [2]清华大学,北京100084
出 处:《水力发电》2008年第3期37-39,共3页Water Power
基 金:国家重点基础研究发展计划基金(2006CB403304)
摘 要:面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。但现行规范对200 m以上高面板堆石坝的面板和防渗设计并无指导性意见,只是提出应进行专门研究。通过对水布垭和巴贡两座高面板堆石坝设计经验的总结,对面板和防渗设计新进展进行分析,可以为200 m以上高面板堆石坝设计提供参考。Face slab is as the water retaining deck of CFRDs, which is very crucial in the overall design of CFRDs. General speaking, the design of face slab includes plinth, face slab, perimeter joints, vertical joints and horizontal joints. The development of design of the high CFRD is based o11 experiences, however, the prevailing specification for CFRDs in China has no detailed guidehnes for the dams over 200m. Based on the conclusion of the construction of CFRDs, including Shuibuya Dam(233m)and Balun Dam(205m),the article illustrate the design of face slab and impervious measures for future design reference.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117