沙溪口大坝19号坝段渗流成因分析及处理  

Seepage Causes Analysis and Treatment at No.19 Dam Block of Shaxikou Dam

在线阅读下载全文

作  者:吕永宁[1] 李涛[1] 阙树清[2] 

机构地区:[1]国家电力监管委员会大坝安全监察中心,浙江杭州310014 [2]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《水力发电》2008年第3期100-102,共3页Water Power

摘  要:沙溪口大坝自首次蓄水以来,19号坝段基础排水孔的排水量较其他坝段大,占溢流坝段坝基总排水量的50%左右。通过分析基础渗流监测资料,复查基础水文地质和工程地质条件,初步分析探讨了渗漏成因,并提出采用现场钻孔、测压、连通性等试验进一步验证。根据试验成果查明了基础排水孔水量大的原因,提出了合理的处理意见。Since the first impounding of Shaxikou dam, the seepage from the dam base drainage holes of No.19 dam block has been much more than other drainage holes, which is about 50% of the total seepage from spillway dam blocks. The seepage causes are initially analyzed and discussed by analysis Of dam base seepage monitoring data, re-referring to data of dam base hydrogeology and engineering geology.Field drill test,Water pressure measuring and communicating holes tests are put forward.The seepage causes which are much more than other dam blocks are found out.Furthermore,Reasonable treatment advices are advanced.

关 键 词:渗漏 扬压力 钻孔试验 承压水 测压试验 沙溪口大坝 

分 类 号:TV698.233[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象