检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中石化销售有限公司华北分公司,天津300041 [2]江汉石油管理局油建公司,湖北潜江433123 [3]胜利石油管理局胜利油建公司,山东东营257073
出 处:《石油工程建设》2008年第2期63-65,共3页Petroleum Engineering Construction
摘 要:石家庄—太原成品油管道工程,管道穿越太行山及黄土塬地区约200 km,其中黄土塬地区上层几十米内全部是湿陷性黄土,冲沟发育,下切深,沟陡,土质承载力极差,施工条件十分恶劣,管沟开挖后恢复困难,一旦处理不好,不仅会造成水土流失,破坏当地生态环境,而且严重影响管道的安全运行。针对这种情况,采取了一系列行之有效的措施,顺利完成了管道的水工保护工程,达到了水工保护效果。文章介绍了典型黄土塬冲沟地段的水工保护设计原则和施工方法。Shijiazhuang-Taiyuan Products Pipeline passes through the Taihang Mountain and the loess plateau for 200 km.The upper stratum of the loess plateau consists fully of collapsible loess of several dozen meters in thickness with deep and steep gullies.The earth bearing capacity is extremely low and the construction condition is terribly harsh,recovering work after ditching is difficult.If the treatment is not well done,not only the soil erosion occurs and it damages the local ecologic environment,but also the safe running of pipeline is severely threatened.Aimed at these problems,a series of effective measures were adopted to implement hydraulic protection engineering and the hydraulic protection was achieved.This paper presents the design principle and construction methods of the hydraulic protection in gullied loess plateau.
分 类 号:TE973.8[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229