南方低水头径流式电站的水库浸没问题  被引量:13

Inundating Problem in Reservoir of Low-head Run-of-river Plant in South China

在线阅读下载全文

作  者:李宁新[1] 

机构地区:[1]中水珠江规划勘测设计有限公司,广东广州510611

出  处:《人民珠江》2008年第2期30-33,共4页Pearl River

摘  要:根据河流一级阶地(含高漫滩)水文地质结构的特殊性,分析河槽型和平原型水库蓄水后两岸地下水动力条件的变化,提出一级阶地宜采用承压水计算模式预测两岸地下水雍高;论证岸后承压渗流场作用下形成的浸没实质是黏性土盖层的"弱结合水浸没"。同时,针对浸没区承压渗流和"弱结合水浸没"特征,分析了常见的治理措施存在的问题,提出了改进治理建议。The variation of the underground hydraulic conditions after the water storage in the channel storage reservoir and plain reservoir has been analyzed with the reference to the unique hydrological and geological structures of the first terrace of the river ( high valley flat section). It is suggested that the confined water pressure be used to predict the affluent level. It has been proved that the inundation by the seepage flow field pressure can be defined as " the weak bonding inundation" . The analysis of the problems in the regular treatment measures has been done with the reference of the pressure seepage flow field and the weak bonding inundation situation, and improvement measures have been figured out.

关 键 词:河槽型水库 水库浸没 弱结合水浸没 压渗(填高)复垦 

分 类 号:P641.72[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象