检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵志丹[1] 陈志刚[1] 王晓勇[1] 李文军[1] 梁朝[1] 张健[2]
机构地区:[1]西安热工研究院有限公司,陕西西安710032 [2]华能淮阴电厂,江苏淮阴223300
出 处:《热力发电》2008年第4期1-5,共5页Thermal Power Generation
摘 要:介绍直接能量平衡(DEB)的构成方式及DEB方式下各相关子系统的控制过程。对华能淮阴电厂330MW机组和华能新华电厂330MW机组协调控制进行优化,并进行了15%范围3%变化率的变负荷试验、自动发电控制(AGC)三角波投入方式下的变负荷考核、辅机故障减负荷(RB)试验。结果表明,协调控制及其子系统能够完全满足机组各种运行工况的要求。The constructive form of direct energy balance (DEB) and the control process of each related sub - system under the DEB mode have been presented. The coordinated control of 300 MW units in Huaneng Huai' yin Power Plant and of 330 MW units in Huaneng Xin - hua Power Plant has been optimized, and the load variation test at 3% changing rate and in 15% range, assessment of putting automatic generation control(AGC) into service under triangle wave load variation, and run back(RB) test being carried out. Results show that the coordinated control and its sub - system can fully meet the requirements of different operating conditions.
关 键 词:330 MW机组 协调控制 DEB 优化 变负荷试验
分 类 号:TP323[自动化与计算机技术—计算机系统结构]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30