出  处:《热力发电》2008年第4期1-5,共5页Thermal Power Generation

摘  要:介绍直接能量平衡(DEB)的构成方式及DEB方式下各相关子系统的控制过程。对华能淮阴电厂330MW机组和华能新华电厂330MW机组协调控制进行优化,并进行了15%范围3%变化率的变负荷试验、自动发电控制(AGC)三角波投入方式下的变负荷考核、辅机故障减负荷(RB)试验。结果表明,协调控制及其子系统能够完全满足机组各种运行工况的要求。The constructive form of direct energy balance (DEB) and the control process of each related sub - system under the DEB mode have been presented. The coordinated control of 300 MW units in Huaneng Huai' yin Power Plant and of 330 MW units in Huaneng Xin - hua Power Plant has been optimized, and the load variation test at 3% changing rate and in 15% range, assessment of putting automatic generation control(AGC) into service under triangle wave load variation, and run back(RB) test being carried out. Results show that the coordinated control and its sub - system can fully meet the requirements of different operating conditions.

关 键 词:330 MW机组 协调控制 DEB 优化 变负荷试验 

分 类 号:TP323[自动化与计算机技术—计算机系统结构]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象