检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《湖北电力》2008年第2期23-24,57,共3页Hubei Electric Power
摘 要:通过国电长源荆门热电厂200 MW机组在低谷负荷时的进相运行试验,详细分析了利用发电机进相运行调压所应考虑的问题及其在实际运行中的解决方法,并对发电机进相运行的调压效果作出了定性的分析。The Plant of state pow leading phase ope leading phase operation test was performed on a er generation group during valley load time. The ration to regulate voltage, and the solving method 200 MW unit of Jingmen Thermal Power problems which should be considered in in practical operation were analyzed in detail. The qualitative analysis of voltage regulation effect as the generator operating in leading phase was achieved,
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.133.33