检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王培霞[1] 史万苹[1] 刘宇蕾[1] 李永峰[2]
机构地区:[1]大庆油田力神泵业有限公司,大庆163311 [2]上海工程技术大学化学化工学院,上海201620
出 处:《上海工程技术大学学报》2008年第1期40-43,共4页Journal of Shanghai University of Engineering Science
基 金:上海市教委重点科研项目(07ZZ156)
摘 要:分析产生潜油电机定子压装工艺过程中存在的定子冲片间压力不均问题及定子铁芯预压后每节定子冲片长度严重超差的原因,提出了新的定子叠装预压工艺方法。用方差分析方法和自行研制的单节定子冲片预压机进行定子冲片叠装预压试验,给出定子预压压力值及实验验证。实验结果表明,潜油电机定子铁芯预压可以采用单节定子硅钢片定压力叠压,铜片采用定量叠压方法,同系列电机定子铁芯预压应采用不同定子压力值。It was analysed that the problem of pressure imbalance among stator teeth and the reason of length difference among them in each section of stator after the preloading of iron core of it in the process of electric motor stator assembly. A new kind of stator assembly technique was developed. The pressure value of stator preloading and experimental verification were got through the analysis of variance and implementing overlapping tests of stator teeth preloading by a self- designed preloading machine for teeth of the single section stator. The result indicates that the feasibility of using fixed preloading value for silicon steel slices in each single section of stator in the process of iron core preloading for the electric motor, fixed amount of overlapped preloading method for copper slices, and using different stator pressure value in the process of iron core preloading for the motor stator of same series.
分 类 号:TE931[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147