检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江委长江科学院宜昌科学研究所
出 处:《中国三峡建设》1997年第8期16-18,45,共3页China Three Gorges Construction
摘 要:三峡工程大江截流的规模巨大,综合指标居世界同类工程的前列。在水深、流量大、工期紧的困难条件下,确保大江胜利截流,必须做好截流技术研究和相应的实施准备。宜昌科研所运用几个不同比尺及功能的水力学模型研究大江深水截流有关的水力学问题,提出大江截流平抛垫底,两岸戗堤提前进占的方案,可以顺利实现截流。it is essential for the river closure work of the Three Gorges Project with suchcomprehensive indexes as deep water, large discharge, large dumping quantity within a short timeframe without precedent for the similar works in the world, that researches on the technique ofriver closure and construction preparation should be fully conducted. The river closure can besuccessfully completed by lifting the elevation of the river bed, reducing the water depth byfrontal dumping from boats in advance, and advancing by end --dumping method from eitherbank in advance, based on several scales of hydraulic model experiments done by the YichangScientific Research institute.
分 类 号:TV551.21[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249