钢管输电铁塔插板节点受拉极限承载力分析  

Analysis for ultimate tensive capacity of slotted gusset plate connections to tubes on transmission towers

在线阅读下载全文

作  者:翁兰溪[1] 丁兆龙 

机构地区:[1]福建电力勘测设计院,福建福州350003 [2]中国轻工业长沙工程有限公司,湖南长沙410007

出  处:《闽江学院学报》2008年第2期36-39,共4页Journal of Minjiang University

摘  要:大型输电铁塔广泛应用钢管节点,为了简化制作安装,避免复杂的相贯线切割,塔身斜材与主材的连接经常将钢管开长槽孔和插入的钢板焊接.由于钢管截面只是部分和钢板连接,在拉力作用下,管板节点易发生剪切滞后破坏.为研究剪切滞后对管板节点受拉极限承载力的影响,进行了一系列分析,并将研究结果和现行设计规范公式进行了比较.The tubular joints are wildly used in transmission towers. Because tubular joints have complexity process of machining, slotted gusset plate connections to tube are used, and this joint can be destroied by shear lag, because ofpartly connection of tube and plate. Analysis on the influence of shear lag to the ultimate tensive capacity of joints was carried on. Through a lot of calculation and analysis,some conclusion is presented and compared with relevant design codes.

关 键 词:输电铁塔 剪切滞后 插板节点 受拉极限承载力 

分 类 号:TU392.3[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象