高温季节泵站泵送混凝土施工的温控防裂方法研究  被引量:9

Research on Temperature Control and Crack Prevention of Pumped Concrete of Pump Stations Built in Summer

在线阅读下载全文

作  者:乜树强[1] 陈沛 朱岳明[1] 王振红[1] 

机构地区:[1]河海大学水利水电工程学院,南京210098 [2]河南驻马店河道管理局,河南驻马店463000

出  处:《中国农村水利水电》2008年第4期105-107,共3页China Rural Water and Hydropower

基  金:国家自然科学基金资助项目(5057080);水利部科技创新重点项目资助(SCXC2003-10);河海大学院士学科发展基金资助(HHUYS003)

摘  要:泵站裂缝是一直困扰工程界的"疑难杂症",裂缝的出现使人们对于泵站能否安全运行产生很大的疑虑。针对这种情况,将冷却水管技术应用于泵站施工期,并且采用"表面保温+内部水管降温"的双重防裂措施。以上方法在南水北调淮安第四泵站工程中得以应用,获得了良好的效果,迄今为止在已经完工的部分尚未发现裂缝,可以为类似工程建设提供借鉴作用。Since cracks make people feel doubtful about the safe operation of projects, cracks in pump stations are a problem that has been perplexing the field of engineering. To deal with the problem, the author puts forward the application of pipe cooling to the structure of pump stations. In addition, a dual measure including superficial preservation and pipe cooling for crack prevention is proposed. With the application in one pump station, the above methods proved to be effective. So far, no cracks have been found in the completed part of the structure. The result shows that the method can be applied to similar projects.

关 键 词:泵站 温控防裂 泵送混凝土 冷却水管 仿真计算 

分 类 号:TV315[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象