检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林志远[1]
机构地区:[1]广东电网公司,广州510600
出 处:《广东电力》2008年第4期32-37,共6页Guangdong Electric Power
摘 要:印度经济改革从1991年开始。在电力行业方面,是按照世界银行的指导进行自由化、私有化的电力体制改革,对外开放让外国投资建设独立发电厂,在国内进行电力行业重组等。以1990—2005年的各种数据和事件,分析了印度电力改革的成绩和存在问题,指出政治发展与经济改革的非良性互动,是造成印度电力改革进展缓慢的症结所在。India's economic reform began in 1991, There have been some steps in its electric power reform including taking liberalized and privatized electric power system reform according to the guidance of the World Bank, being open to the outside world to encourage foreign investors to build independent power plants, restructuring its domestic power industry, and so on. This paper takes various data and incidents during 1990-2005 as example, analyzing the achievements and existing problems of lndia's power reform, pointing out that the crux of slow reform in lndia's power industry is the bad interaction of India's political and economic reforms.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.24.23