检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈灯红[1] 彭刚[1] 陈高峰[1] 祝承义[2]
机构地区:[1]三峡大学土木水电学院,湖北宜昌443002 [2]二滩水电开发有限责任公司,成都610021
出 处:《三峡大学学报(自然科学版)》2008年第2期16-19,共4页Journal of China Three Gorges University:Natural Sciences
摘 要:采用三维有限元法,对龙滩碾压混凝土重力坝21坝段坝体及引水道组合结构进行了分析.研究了施工期及运行期4种工况下坝体的应力变形情况,重点了解了引水道沿水流方向8个剖面的环向应力、闸门槽周边正应力及坝内3个廊道周边环向应力,并对计算结果进行了分析评价.最后文中给出了一些建议,为结构的设计、施工提供参考依据.The structure of the dam body and the diversion waterway of the 21st monolith of Longtan Roller Compacted Concrete (RCC) Gravity Dam is analyzed based on 3 D finite element method. The stresses and deformations of the dam body are researched for it is under 4 working conditions of the construction stage and the operating period. And the circumferential stresses of the diversion waterway's 8 cross-sections which are along the water flow, the normal stresses around the gate slot, the circumferential stresses around the 3 galleries are mainly studied; and the calculation results are analyzed and evaluated. Finally, some reasonable suggestions which could be referred in the design and construction are given.
关 键 词:三维有限元 引水道 应力变形 环向应力 龙滩重力坝
分 类 号:TV314[水利工程—水工结构工程] TV642.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117