圆满贯水电站拱坝泄洪消能问题的试验研究  被引量:1

Experimental study on energy dissipation for arch dam in Yuanmanguan power station

在线阅读下载全文

作  者:苏靖 尹进步[2] 陈卫平[3] 

机构地区:[1]中国水利水电建设集团新能源公司,贵州贵阳550001 [2]西北农林科技大学水利与建筑工程学院,陕西杨凌712100 [3]贵州遵义水利水电勘测设计研究院,贵州遵义563002

出  处:《水资源与水工程学报》2008年第2期85-87,共3页Journal of Water Resources and Water Engineering

摘  要:利用水工水力学模型试验研究方法对圆满贯工程泄洪消能问题进行研究分析同时,为百米级拱坝在五表孔布置方面,提供了一种全新的泄洪消能工体型与设计思路,即采用宽尾墩窄缝纵向水舌与连续鼻坎横向扩散的布置形式,可以使水舌在纵向与横向实现全范围的扩散,消能率提高,适应不同运行方式需要的同时,缩短了RCC拱坝施工工期,节约了工程总投资。The experimental study on energy dissipation for Yuanmanguan Power Station was car-ried out by the hydraulic model test, put forward a new energy dissipator style and its designing method on five crest spillway flood for arch dam. The new energy dissipator is constituted by flaring gate pier and deflector bucket. Spillway flow would be spreaded in cross and longitude. Energy dissipation ratio would be increased, the period of RCC arch dam construction and gross engineering investment would be reduced.

关 键 词:拱坝 消能 冲坑深度 

分 类 号:TV652.12[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象