检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南水北调东线江苏水源有限责任公司,南京210029 [2]江苏省江都水利工程管理处,江苏江都225200 [3]扬州大学能源与动力工程学院,江苏扬州225009
出 处:《南水北调与水利科技》2008年第3期22-25,共4页South-to-North Water Transfers and Water Science & Technology
摘 要:宝应抽水站是南水北调东线工程第一个建设、建成并发挥作用的泵站,也是第一个通过招投标选择代管单位的泵站。研究代管泵站的人员组成及经费构成,比较泵站代管方式与传统管理方式在人员组成与经费支出方面的区别,指出代管方式的优点及其需要改进的方面。研究、总结宝应抽水站两年多的代管经验,对于我国泵站管理体制的改革,特别是对于大批即将建成投运的南水北调工程泵站的管理,具有重要的借鉴意义和推广应用价值。Baoying pumping station is the fist pumping station of Eastern Route Project for South-to-North Water Transfer Projects that had been built and put into use. It is also the first pumping station whose management substitute was selected by biding bond. The personnel and outlay components of the substitute management pump station were studied. The substitute management mode was compared with the traditional management mode on personnel components and outlay. The merits and aspects to be improved of the substitute management were pointed out. It has important referential significance and popularized application importance to study and sum up the 2-year substitute management experiences of Baoying pumping station to management system reformation of pumping stations of our country, and especially to the management of a large number of pumping stations to be built for South-to-North Water Transfer Projects.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127