检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《发电设备》2008年第3期215-218,共4页Power Equipment
摘 要:国内首台300MW供热机组投产初期发生高压调速汽门泄漏问题,阀芯回座后汽轮机无法降至安全转速,存在重大隐患。运用有限元分析等手段,从应力、位移、卡涩、提升力等多方面对改进方案进行论证分析,减小了阀芯外径和导向套筒内径,成功解决了这一机组高压调门严密性问题。In early operational periods of the first domestic 300MW heat supply unit, leakage problems were encountered by its high-pressure control valve, under which condition, the turbine speed could not be reduced to safety set point after the valve core had returned to its seat, i.e. great hidden dangers existed. Using finite element approaches, based on analysis of relevant stresses, displacements, core jamming possibilities and lift forces etc. , the problems are successfully resolved by reducing the outer diameter of valve core and the inner diameter of guide tube.
分 类 号:TK263.5[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15