检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁洪涛[1] 付长虹[1] 李春廷[1] 焦晓霞[1] 王彦滨[1] 牟松[1]
机构地区:[1]哈尔滨电机厂有限责任公司,哈尔滨150040
出 处:《大电机技术》2008年第3期55-59,共5页Large Electric Machine and Hydraulic Turbine
摘 要:本文对目前国内汽轮发电机大件(定子)运输现状和面临的问题以及对设计的影响进行了论述,提出1000MW级发电机定子运输的新概念,即货物—工具—车辆组成的"系统"集成设计以适应现有铁路运输条件的创新思路,并对未来更大容量汽轮发电机定子的铁路运输问题的解决方法进行了阐述。The paper discusses the status and the encountered problems for transportation of turbogenerator large piece (stator) in china, along with the effects on design. It brings forward the new transportation concept for 1000MW generator stator, namely creative thought for "system" integration design composed of cargo-tools-vehicles to adapt the existing conditions of railway transportation. The paper also expatiates the solution of railway transportation problem for larger capacity turbogenerator stator in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12