检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何勇 刘玮[2] 刘汉生 唐炎 龚群[2] 马志坚[2]
机构地区:[1]湖北省电力勘测设计院,武汉市430024 [2]北京国电华北电力工程有限公司,北京市100011
出 处:《电力建设》2008年第6期30-34,共5页Electric Power Construction
摘 要:三沪±500kV直流输电线路的杆塔,进行了多方面的优化设计,主要体现在:因绝缘配置比以往工程要高,提高了防污闪能力,故塔头尺寸比以往的要大I;串直线塔和V型串直线塔的塔身均采用方形断面和一次坡型式,既美观,塔身整体刚度也好;塔身上部较窄按小交叉的斜材不等节间布置方式,塔身下部较宽按大交叉的斜材布置方式,使塔身主材受力状况达到最优;悬垂转角塔塔头采用无挂架方式。The poles and towers design for San-Hu ±500 kV DC project are optimized in many aspects, mainly including: to increase dust flashover resistance due to higher insulation configuration, the size of tower head is larger than previous design; square tower body design, which is not only beautiful, but also strong, is used for both l-shaped and V-shaped towers; small-crossed wed members are arranged unevenly on the narrower upper portion of the tower, while large-crossed wed members form the wider lower portion of the tower, which optimizes main members' load condition; and the suspension angled tower uses armless head.
分 类 号:TM753[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15