检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水科学与工程技术》2008年第3期60-63,共4页Water Sciences and Engineering Technology
摘 要:输变电工程土壤侵蚀属典型的人为加速侵蚀,其侵蚀类型、程度和强度与主体工程建设有着直接的关系。在对冀南地区衡水等500kV输变电工程所处的环境条件实地调查的基础上,依照水土保持法律法规及规范,计算出工程建设和植被恢复期产生的土壤流失量,分析其水土流失重点区域,确定了本项工程建设的水土流失防治责任范围和水土流失防治分区,针对项目建设提出了防治土壤侵蚀的建议。The soil erosion for Power Transmission & Transformation Pilot Project is typically artificial accelerated erosion. The type of erosion, extent and intensity has a direct relationship with the main project construction. Based on the investigation of environmental condition of 500 kV Power Transmission & Transformation Pilot Project in south of Heibei province, soil loss amount during project construction and vegetation restoration period is calculated. And the main soil loss area is analyzed. So the soil and water loss responsibility extent and control zoning is certain. Some suggestions about controlling soil erosion are taken in this program.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3