IGCC电厂的工程设计、采购和施工成本的估算模型  被引量:2

Research on IGCC EPC Estimation Model of China

在线阅读下载全文

作  者:黄河[1] 何芬[1] 李政[1] 倪维斗[1] 何建坤[2] 张希良[2] 麻林巍[1] 

机构地区:[1]清华大学热能工程系,北京100084 [2]清华大学核研院,北京100084

出  处:《动力工程》2008年第3期475-479,共5页Power Engineering

基  金:国家973课题资助项目(2005CB221207)

摘  要:在对整体煤气化联合循环(IGCC)电厂进行经济性估算时,工程设计、采购和施工成本(EPC)的估算直接影响其结果的准确性.国外相关EPC模型并不适用于我国.为此,结合国内情况以及相应设备的实际报价和工程造价,充分考虑到国产化程度的不同,对这些投资模型进行了修正,主要包括对地区因子、规模因子、时间因子的修正和添加,从而得到符合我国实际情况的IGCC的EPC模型.In economic assessment of Integrated Gasification Combined Cycle (IGCC), estimation of EPC (Engineering, Procurement, Construction) cost directly affects the reliability of results. Relevant Foreign EPC models are not suitable for ChinEs situation. Reasonable modifications on these models were provided to take into account different localization levels of key equipments, based on equipment quotations and the actual project cost in domestic market. The main contribution is to add or modify regional factor, scaling factor and time factor to original models, finally obtaining the IGCC EPC model based on China's actual situation.

关 键 词:能源与动力工程 IGCC EPC 经济性 估算模型 成本 

分 类 号:TK01[动力工程及工程热物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象