机构地区:[1]清华大学水电工程系,北京100084 [2]清华大学,北京100084
出 处:《中国三峡建设》1997年第11期15-17,共3页China Three Gorges Construction
摘 要:三峡工程导流底孔是三期导流期间洪水下泄的主要通道,运用条件复杂,研究了短管和长管两种方案:“短管”方案特点有压段短(长16.22m),弧形门位于坝体腹部,门后为明流段;“长管”方案有压管道长(82m),弧形门设在坝下明流段,对坝体削弱较小,闸门安装和拆除方便,封堵工作量较小。设计选用了“长管”方案。The bottom diversion outlets at the Three Gorges Project will be a major way for flood discharge during the third -stage diversion period, with complicated operation conditions.Two layouts have been studied, including 'the short conduit' and 'the long conduit '. They are characterized by a 16. 22 m long pressure conduit connected with a open conduit and a radial gate located in the central part of the dam, and a 82 m long pressure conduit connected with a 28 m long open bucket and a radial gate, respectively for 'the short conduit' and 'the long conduit'. Finally, the latter has been selected by the designer due to its less reduction to the dam body, ease to install and remove the gate, and smaller plugging works.
分 类 号:TV551.1[水利工程—水利水电工程] TV652.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.4.171