一座混凝土自锚式悬索桥吊杆张拉控制技术  被引量:12

Control Techniques for Tensioning of Suspenders of a Self-Anchored Concrete Suspension Bridge

在线阅读下载全文

作  者:王勇[1] 王鹏 

机构地区:[1]中铁大桥局集团桥科院有限公司,湖北武汉430034 [2]湖州市城市建设发展总公司,浙江湖州313000

出  处:《世界桥梁》2008年第A01期68-69,86,共3页World Bridges

摘  要:缩短吊杆张拉施工工期和避免混凝土梁开裂是先梁后索施工的混凝土自锚式悬索桥施工控制中需要研究的重点内容。介绍湖州市飞凤桥吊杆张拉实施方案,为混凝土自锚式悬索桥施工控制提供借鉴。To shorten the construction time schedule for tensioning of suspenders and to avoid cracking in concrete stiffening girder are the important contents required to be well researched in the construction control of a self-anchored concrete suspension bridge whose girder is to be erected first and main cables are to be installed afterwards. In this paper, the implemented construction scheme for tensioning of the suspenders of the Feifeng Bridge in Huzhou City is presented for reference to the construction control of similar concrete suspension bridges.

关 键 词:自锚式悬索桥 吊杆 张拉 施工控制 

分 类 号:U448.25[建筑科学—桥梁与隧道工程] U445.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象