深基坑深层多级降水土钉墙支护及应用  被引量:1

Soil nailing wall with multi-stage dewatering system for deep foundation pit and its application

在线阅读下载全文

作  者:邹宝祥 樊敬亮[2] 徐方敏[1] 

机构地区:[1]江苏华都建设有限公司 [2]江苏华东建设基础工程总公司

出  处:《山西建筑》2008年第18期99-100,共2页Shanxi Architecture

摘  要:对由管井、管道泵及轻型井点等构成的综合多级降水系统进行了分析,解决了承压水地区基坑不易降水的难题,指出在基坑侧壁台阶上设置地圈梁加土锚结构,增强了支护体系的整体刚度,有效地控制了基坑侧壁的变形,工程实践证明,深基坑深层多级降水土钉墙支护安全可靠。The multi-stage dewatering system which consists of tube wells, pipeline pumps and light wells is analyzed. The question that dewa- tering for deep foundation pit is difficult in the confined water area is solved. Ring beams and soil anchors are set up on the steps of deep foundation pit deep, s side, which increases the overall stiffness of supporting system and controls the deformation of deep foundation pit deep' s side effectively. Practice shows that the soil nailing wall with the multi-stage dewatering for deep foundation pit is safe and reliable.

关 键 词:深基坑 多级降水 土钉墙 基坑支护 

分 类 号:TU463[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象