检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电》1997年第12期47-50,共4页Water Power
摘 要:输排冰运行是引水式水电站冬季运行的主要方式之一,顺利有效地输排冰是清除冰害,保证水电站冬季安全运行的首要问题。新疆地区建有大批引水式水电站,由于该地区气候特点,大都采用输排冰运行方式,为此近年进行了大量压力前池输排冰结构布置型式的试验研究工作,通过系列模型试验得出输排冰运行条件,给出了反映输排冰效果的无量纲参数冰水比K值最大时不同排冰形式的优化布置方案,为引水式水电站输排冰设计提供了参考依据。The operation of ice delivery and sluicing is one of main operation ways of the diversiontype hydropower station in the winter.How to deliver and sluice the ice smoothly and effectively is the key problem to guarantee safe operation of hydropower station in the winter.There are a lot of diversiontype hydropower stations in Xinjiang,Due to the climate features,most of these stations adopt the operation of ice delivery and sluicing.In recent years,a lot of tests and studies on the structural arrangement for ice delivery and sluicing in pressure fore bay have been conducted.The operation conditions of ice delivery and sluicing have been gained by a series of model tests.The optimal layout schemes of different ice sluicing ways have been given. The ratio of ice to water,a nondimensional factor reflecting the effectiveness of ice delivery and sluicing,is maximum. All these provides the reference basis for the design of the ice delivery and sluicing of the diversiontype hydropower station in winter.
分 类 号:TV747[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145