检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东省水工机械厂,山东兖州272100 [2]山东省水利科学研究院,山东济南250013
出 处:《地质装备》2008年第3期35-38,共4页Equipment for Geotechnical Engineering
摘 要:高密度电阻率法在野外工作时,经常会遇到地形条件较复杂的区域,如何在常规的采集资料中赋予地形变化的信息显得十分重要。本文简单介绍了RES2DINV软件,并结合工程实例讲述了RES2DINV软件中地形改正的方法与步骤,从而使反演的电阻率图像更接近实际地形地貌,有利于成果图件的分析和解译。While we work in the field where the topographic and geological conditions are complex by high density resistivity, it is very important for us to fit the topographic information into the normal data of the electricity. In this paper, it introduces simply the rapid 2D resistivity and IP inversion soft, and it set forth the means and steps by engineering sample. So, the observed apparent resistivity pseudosection is close to the actual topography and physiognomy and it is good for us to analyze and explain the fruit figures.
关 键 词:高密度电阻率法 RES2DINV 地形改正 高程
分 类 号:P631.34[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33