检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《山西财经大学学报》2008年第5期113-117,共5页Journal of Shanxi University of Finance and Economics
基 金:国家自然科学基金资助项目(No.70672105)
摘 要:从R&D活动的特点来看,以财务指标为主的传统风险评价方法并不适用于R&D项目的风险评价。我们将研发过程分为三个阶段,分别确定各阶段的风险因子,据此设置了研发财务风险评价指标体系。在此基础上,引入模糊综合评价方法,构建了研发过程财务风险二级模糊综合评价模型,并以一家生物制药企业为例,对该公司菌苗项目中试阶段的财务风险状态进行了评价。The financial risk of R&D project can not be ignored, and the traditional evaluation method can not judge the financial risk of R&D project because of the characteristic of R&D project. This paper divides the R&D progress into three phrases and finds out the risk factors of every phases, and sets a factors system of financial risk of R&D base on risk factors, Then the authors introduce fuzzy comprehensive evaluation method into financial risk evaluation and present a two stages evaluation model of fuzzy comprehensive evaluation. At last, as an example, the authors evaluate the financial risk of a vaccine trial project of a biopharmaceutical company's use the model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94