机构地区:[1]长江科学院材料与结构研究所,湖北武汉430010
出 处:《水利水电科技进展》2008年第3期50-53,共4页Advances in Science and Technology of Water Resources
基 金:国家自然科学基金(50539010)
摘 要:以三峡地下电站厂房岩锚梁为研究对象,采用三维有限元数值仿真技术,从岩锚梁混凝土浇筑季节、预应力锚杆加载方式等方面,就如何控制岩锚梁的温度应力进行探讨。认为岩锚梁产生较大温度应力的主要原因是预应力锚杆极大地增加了围岩对岩锚梁的约束作用,限制了梁体的温度变形;为有效降低岩锚梁的温度应力,应尽量安排在低温季节浇筑岩锚梁混凝土,采取分期加载或"卸载—恢复预应力"等温控措施和施工工艺。The problem of how to control the temperature stress on a rock anchor beam is analyzed with 3D FEM technology and with consideration of concrete-pouting season, pre-stressed loading means, and other factors, using a rock anchor beam in the underground powerhouse of the Three Gorges Project as an example. The results show that the pre-stressed anchor greatly enhances the constraint and restricts the temperature deformation of the beam. To deduce the temperature stress on the rock anchor beam efficiently, some measures should be taken: the pouring of concrete in a low-temperature season, application of the pre-stress in several stages and use of load-unload-restore pre-stressed technology.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28