检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]郑州大学环境与水利学院,河南郑州450002 [2]郑州煤炭工业集团芦沟矸石热电厂,河南郑州450002
出 处:《河海大学学报(自然科学版)》2008年第1期82-87,共6页Journal of Hohai University(Natural Sciences)
基 金:河南省科技攻关项目(0624250008)
摘 要:选取郑州市某32层高218.5 m建筑物的3根大直径超长灌注桩进行静载荷试验,并对桩的荷载与沉降的关系及桩身应力测试结果进行了分析.结果表明,大直径超长灌注桩为纯摩擦桩,桩侧摩阻力大小取决于桩土相对位移大小和桩周土的种类、密实程度等因素,桩顶沉降主要来自于桩身压缩和压屈变形,无刚体位移,采取无限制增加桩长的方法很难达到提高桩基承载力的目的.Static loading tests were performed on 3 super-long large-diameter bored piles of a 32-storey building with the height 218.5 m in Zhengzhou City. The analysis of the relationship between the loads and settlements of piles and the test results of pile stresses shows that super-long large-diameter bored piles are pure friction piles, the lateral friction along pile bodies depends on the relative displacement between soil and piles and the types and compactness of soils around piles, and that with negligible rigid body displacement, the settlement at the top of piles is mainly induced by compressive strain and buckling strain of pile bodies, therefore it is difficult to improve the bearing capacity of pile foundation only by increase of pile length unlimitedly.
关 键 词:大直径超长混凝土灌注桩 摩阻力 端阻力 静载荷试验
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120