检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《石油钻采工艺》1997年第6期93-95,共3页Oil Drilling & Production Technology
摘 要:压裂改造系统工程是以提高油田采收率、保持稳产为目标,从改造区块的整体出发,以欲压裂并为中心,对其注采系统实施最佳改造措施,使油井压裂后达到较理想的生产状态。阐述了对欲压裂改造油藏进行系统分析、系统设计、系统管理和系统评价的方法。该方法在大庆杏北油田的应用,见到了明显的增油效果,对弥补油田产量的自然递减、保持原油稳产起到了重要作用。Systematic fracture stimulation engineering is a project which is used to im prove recovery and keep production stabilization. Based on the stimulation requirement of a bfock entity, optimum stimulation are run in production and injection system focusing on de sired wells which need to be fractured. An ideal production status is reached after oil well fracturing. The paper giveS a method for systematic analysis, design, management and eval uation to a desired reservoir which needs to be fractured. An oil increment has been shown after the method was used in Daqing Xingbei oil field. It plays a very important role in keep ing oil production stabilization.
分 类 号:TE357.14[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104